Creating a test plan is often a complex undertaking. An ideal test plan is accomplished by applying basic principles of cost-benefit analysis and risk analysis, optimally balancing these software development factors:
  • Implementation cost: The time and complexity of implementing testable features and automated tests for specific scenarios will vary, and this affects short-term development cost.
  • Maintenance cost: Some tests or test plans may vary from easy to difficult to maintain, and this affects long-term development cost. When manual testing is chosen, this also adds to long-term cost.
  • Monetary cost: Some test approaches may require billed resources.
  • Benefit: Tests are capable of preventing issues and aiding productivity by varying degrees. Also, the earlier they can catch problems in the development life-cycle, the greater the benefit.
  • Risk: The probability of failure scenarios may vary from rare to likely, and their consequences may vary from minor nuisance to catastrophic.
Effectively balancing these factors in a plan depends heavily on project criticality, implementation details, resources available, and team opinions. Many projects can achieve outstanding coverage with high-benefit, low-cost unit tests, but they may need to weigh options for larger tests and complex corner cases. Mission critical projects must minimize risk as much as possible, so they will accept higher costs and invest heavily in rigorous testing at all levels.

This guide puts the onus on the reader to find the right balance for their project. Also, it does not provide a test plan template, because templates are often too generic or too specific and quickly become outdated. Instead, it focuses on selecting the best content when writing a test plan.


Test plan vs. strategy


Before proceeding, two common methods for defining test plans need to be clarified:
  • Single test plan: Some projects have a single "test plan" that describes all implemented and planned testing for the project.
  • Single test strategy and many plans: Some projects have a "test strategy" document as well as many smaller "test plan" documents. Strategies typically cover the overall test approach and goals, while plans cover specific features or project updates.
Either of these may be embedded in and integrated with project design documents. Both of these methods work well, so choose whichever makes sense for your project. Generally speaking, stable projects benefit from a single plan, whereas rapidly changing projects are best served by infrequently changed strategies and frequently added plans.

For the purpose of this guide, I will refer to both test document types simply as "test plans”. If you have multiple documents, just apply the advice below to your document aggregation.


Content selection


A good approach to creating content for your test plan is to start by listing all questions that need answers. The lists below provide a comprehensive collection of important questions that may or may not apply to your project. Go through the lists and select all that apply. By answering these questions, you will form the contents for your test plan, and you should structure your plan around the chosen content in any format your team prefers. Be sure to balance the factors as mentioned above when making decisions.


Prerequisites


  • Do you need a test plan? If there is no project design document or a clear vision for the product, it may be too early to write a test plan.
  • Has testability been considered in the project design? Before a project gets too far into implementation, all scenarios must be designed as testable, preferably via automation. Both project design documents and test plans should comment on testability as needed.
  • Will you keep the plan up-to-date? If so, be careful about adding too much detail, otherwise it may be difficult to maintain the plan.
  • Does this quality effort overlap with other teams? If so, how have you deduplicated the work?

Risk


  • Are there any significant project risks, and how will you mitigate them? Consider:
    • Injury to people or animals
    • Security and integrity of user data
    • User privacy
    • Security of company systems
    • Hardware or property damage
    • Legal and compliance issues
    • Exposure of confidential or sensitive data
    • Data loss or corruption
    • Revenue loss
    • Unrecoverable scenarios
    • SLAs
    • Performance requirements
    • Misinforming users
    • Impact to other projects
    • Impact from other projects
    • Impact to company’s public image
    • Loss of productivity
  • What are the project’s technical vulnerabilities? Consider:
    • Features or components known to be hacky, fragile, or in great need of refactoring
    • Dependencies or platforms that frequently cause issues
    • Possibility for users to cause harm to the system
    • Trends seen in past issues

Coverage


  • What does the test surface look like? Is it a simple library with one method, or a multi-platform client-server stateful system with a combinatorial explosion of use cases? Describe the design and architecture of the system in a way that highlights possible points of failure.
  • What are the features? Consider making a summary list of all features and describe how certain categories of features will be tested.
  • What will not be tested? No test suite covers every possibility. It’s best to be up-front about this and provide rationale for not testing certain cases. Examples: low risk areas that are a low priority, complex cases that are a low priority, areas covered by other teams, features not ready for testing, etc. 
  • What is covered by unit (small), integration (medium), and system (large) tests? Always test as much as possible in smaller tests, leaving fewer cases for larger tests. Describe how certain categories of test cases are best tested by each test size and provide rationale.
  • What will be tested manually vs. automated? When feasible and cost-effective, automation is usually best. Many projects can automate all testing. However, there may be good reasons to choose manual testing. Describe the types of cases that will be tested manually and provide rationale.
  • How are you covering each test category? Consider:
  • Will you use static and/or dynamic analysis tools? Both static analysis tools and dynamic analysis tools can find problems that are hard to catch in reviews and testing, so consider using them.
  • How will system components and dependencies be stubbed, mocked, faked, staged, or used normally during testing? There are good reasons to do each of these, and they each have a unique impact on coverage.
  • What builds are your tests running against? Are tests running against a build from HEAD (aka tip), a staged build, and/or a release candidate? If only from HEAD, how will you test release build cherry picks (selection of individual changelists for a release) and system configuration changes not normally seen by builds from HEAD?
  • What kind of testing will be done outside of your team? Examples:
    • Dogfooding
    • External crowdsource testing
    • Public alpha/beta versions (how will they be tested before releasing?)
    • External trusted testers
  • How are data migrations tested? You may need special testing to compare before and after migration results.
  • Do you need to be concerned with backward compatibility? You may own previously distributed clients or there may be other systems that depend on your system’s protocol, configuration, features, and behavior.
  • Do you need to test upgrade scenarios for server/client/device software or dependencies/platforms/APIs that the software utilizes?
  • Do you have line coverage goals?

Tooling and Infrastructure


  • Do you need new test frameworks? If so, describe these or add design links in the plan.
  • Do you need a new test lab setup? If so, describe these or add design links in the plan.
  • If your project offers a service to other projects, are you providing test tools to those users? Consider providing mocks, fakes, and/or reliable staged servers for users trying to test their integration with your system.
  • For end-to-end testing, how will test infrastructure, systems under test, and other dependencies be managed? How will they be deployed? How will persistence be set-up/torn-down? How will you handle required migrations from one datacenter to another?
  • Do you need tools to help debug system or test failures? You may be able to use existing tools, or you may need to develop new ones.

Process


  • Are there test schedule requirements? What time commitments have been made, which tests will be in place (or test feedback provided) by what dates? Are some tests important to deliver before others?
  • How are builds and tests run continuously? Most small tests will be run by continuous integration tools, but large tests may need a different approach. Alternatively, you may opt for running large tests as-needed. 
  • How will build and test results be reported and monitored?
    • Do you have a team rotation to monitor continuous integration?
    • Large tests might require monitoring by someone with expertise.
    • Do you need a dashboard for test results and other project health indicators?
    • Who will get email alerts and how?
    • Will the person monitoring tests simply use verbal communication to the team?
  • How are tests used when releasing?
    • Are they run explicitly against the release candidate, or does the release process depend only on continuous test results? 
    • If system components and dependencies are released independently, are tests run for each type of release? 
    • Will a "release blocker" bug stop the release manager(s) from actually releasing? Is there an agreement on what are the release blocking criteria?
    • When performing canary releases (aka % rollouts), how will progress be monitored and tested?
  • How will external users report bugs? Consider feedback links or other similar tools to collect and cluster reports.
  • How does bug triage work? Consider labels or categories for bugs in order for them to land in a triage bucket. Also make sure the teams responsible for filing and or creating the bug report template are aware of this. Are you using one bug tracker or do you need to setup some automatic or manual import routine?
  • Do you have a policy for submitting new tests before closing bugs that could have been caught?
  • How are tests used for unsubmitted changes? If anyone can run all tests against any experimental build (a good thing), consider providing a howto.
  • How can team members create and/or debug tests? Consider providing a howto.

Utility


  • Who are the test plan readers? Some test plans are only read by a few people, while others are read by many. At a minimum, you should consider getting a review from all stakeholders (project managers, tech leads, feature owners). When writing the plan, be sure to understand the expected readers, provide them with enough background to understand the plan, and answer all questions you think they will have - even if your answer is that you don’t have an answer yet. Also consider adding contacts for the test plan, so any reader can get more information.
  • How can readers review the actual test cases? Manual cases might be in a test case management tool, in a separate document, or included in the test plan. Consider providing links to directories containing automated test cases.
  • Do you need traceability between requirements, features, and tests?
  • Do you have any general product health or quality goals and how will you measure success? Consider:
    • Release cadence
    • Number of bugs caught by users in production
    • Number of bugs caught in release testing
    • Number of open bugs over time
    • Code coverage
    • Cost of manual testing
    • Difficulty of creating new tests


GTAC 2016 Registration Deadline Extended

by Sonal Shah on behalf of the GTAC Committee

Our goal in organizing GTAC each year is to make it a first-class conference, dedicated to presenting leading edge industry practices. The quality of submissions we've received for GTAC 2016 so far has been overwhelming. In order to include the best talks possible, we are extending the deadline for speaker and attendee submissions by 15 days. The new timelines are as follows:

June 1, 2016 June 15, 2016 - Last day for speaker, attendee and diversity scholarship submissions.
June 15, 2016 July 15, 2016 - Attendees and scholarship awardees will be notified of selection/rejection/waitlist status. Those on the waitlist will be notified as space becomes available.
August 15, 2016 August 29, 2016 - Selected speakers will be notified.

To register, please fill out this form.
To apply for diversity scholarship, please fill out this form.

The GTAC website has a list of frequently asked questions. Please do not hesitate to contact [email protected] if you still have any questions.

Flaky Tests at Google and How We Mitigate Them

by John Micco

At Google, we run a very large corpus of tests continuously to validate our code submissions. Everyone from developers to project managers rely on the results of these tests to make decisions about whether the system is ready for deployment or whether code changes are OK to submit. Productivity for developers at Google relies on the ability of the tests to find real problems with the code being changed or developed in a timely and reliable fashion.

Tests are run before submission (pre-submit testing) which gates submission and verifies that changes are acceptable, and again after submission (post-submit testing) to decide whether the project is ready to be released. In both cases, all of the tests for a particular project must report a passing result before submitting code or releasing a project.

Unfortunately, across our entire corpus of tests, we see a continual rate of about 1.5% of all test runs reporting a "flaky" result. We define a "flaky" test result as a test that exhibits both a passing and a failing result with the same code. There are many root causes why tests return flaky results, including concurrency, relying on non-deterministic or undefined behaviors, flaky third party code, infrastructure problems, etc. We have invested a lot of effort in removing flakiness from tests, but overall the insertion rate is about the same as the fix rate, meaning we are stuck with a certain rate of tests that provide value, but occasionally produce a flaky result. Almost 16% of our tests have some level of flakiness associated with them! This is a staggering number; it means that more than 1 in 7 of the tests written by our world-class engineers occasionally fail in a way not caused by changes to the code or tests.

When doing post-submit testing, our Continuous Integration (CI) system identifies when a passing test transitions to failing, so that we can investigate the code submission that caused the failure. What we find in practice is that about 84% of the transitions we observe from pass to fail involve a flaky test! This causes extra repetitive work to determine whether a new failure is a flaky result or a legitimate failure. It is quite common to ignore legitimate failures in flaky tests due to the high number of false-positives. At the very least, build monitors typically wait for additional CI cycles to run this test again to determine whether or not the test has been broken by a submission adding to the delay of identifying real problems and increasing the pool of changes that could contribute.

In addition to the cost of build monitoring, consider that the average project contains 1000 or so individual tests. To release a project, we require that all these tests pass with the latest code changes. If 1.5% of test results are flaky, 15 tests will likely fail, requiring expensive investigation by a build cop or developer. In some cases, developers dismiss a failing result as flaky only to later realize that it was a legitimate failure caused by the code. It is human nature to ignore alarms when there is a history of false signals coming from a system. For example, see this article about airline pilots ignoring an alarm on 737s. The same phenomenon occurs with pre-submit testing. The same 15 or so failing tests block submission and introduce costly delays into the core development process. Ignoring legitimate failures at this stage results in the submission of broken code.

We have several mitigation strategies for flaky tests during presubmit testing, including the ability to re-run only failing tests, and an option to re-run tests automatically when they fail. We even have a way to denote a test as flaky - causing it to report a failure only if it fails 3 times in a row. This reduces false positives, but encourages developers to ignore flakiness in their own tests unless their tests start failing 3 times in a row, which is hardly a perfect solution.
Imagine a 15 minute integration test marked as flaky that is broken by my code submission. The breakage will not be discovered until 3 executions of the test complete, or 45 minutes, after which it will need to be determined if the test is broken (and needs to be fixed) or if the test just flaked three times in a row.

Other mitigation strategies include:
  • A tool that monitors the flakiness of tests and if the flakiness is too high, it automatically quarantines the test. Quarantining removes the test from the critical path and files a bug for developers to reduce the flakiness. This prevents it from becoming a problem for developers, but could easily mask a real race condition or some other bug in the code being tested.
  • Another tool detects changes in the flakiness level of tests and works to identify the change that caused the test to change the level of flakiness.

In summary, test flakiness is an important problem, and Google is continuing to invest in detecting, mitigating, tracking, and fixing test flakiness throughout our code base. For example:
  • We have a new team dedicated to providing accurate and timely information about test flakiness to help developers and build monitors so that they know whether they are being harmed by test flakiness.
  • As we analyze the data from flaky test executions, we are seeing promising correlations with features that should enable us to identify a flaky result accurately without re-running the test.


By continually advancing the state of the art for teams at Google, we aim to remove the friction caused by test flakiness from the core developer workflows.

GTAC Diversity Scholarship

by Lesley Katzen on behalf of the GTAC Diversity Committee

We are committed to increasing diversity at GTAC, and we believe the best way to do that is by making sure we have a diverse set of applicants to speak and attend. As part of that commitment, we are excited to announce that we will be offering travel scholarships this year.
Travel scholarships will be available for selected applicants from traditionally underrepresented groups in technology.

To be eligible for a grant to attend GTAC, applicants must:

  • Be 18 years of age or older.
  • Be from a traditionally underrepresented group in technology.
  • Work or study in Computer Science, Computer Engineering, Information Technology, or a technical field related to software testing.
  • Be able to attend core dates of GTAC, November 15th - 16th 2016 in Sunnyvale, CA.


To apply:
Please fill out the following form to be considered for a travel scholarship.
The deadline for submission is June 1st.  Scholarship recipients will be announced on June 30th. If you are selected, we will contact you with information on how to proceed with booking travel.


What the scholarship covers:
Google will pay for standard coach class airfare for selected scholarship recipients to San Francisco or San Jose, and 3 nights of accommodations in a hotel near the Sunnyvale campus. Breakfast and lunch will be provided for GTAC attendees and speakers on both days of the conference. We will also provide a $50.00 gift card for other incidentals such as airport transportation or meals. You will need to provide your own credit card to cover any hotel incidentals.


Google is dedicated to providing a harassment-free and inclusive conference experience for everyone. Our anti-harassment policy can be found at:
https://www.google.com/events/policy/anti-harassmentpolicy.html

GTAC 2016 Registration is now open!

by Sonal Shah on behalf of the GTAC Committee

The GTAC (Google Test Automation Conference) 2016 application process is now open for presentation proposals and attendance. GTAC will be held at the Google Sunnyvale office on November 15th - 16th, 2016.

GTAC will be streamed live on YouTube again this year, so even if you cannot attend in person, you will be able to watch the conference remotely. We will post the livestream information as we get closer to the event, and recordings will be posted afterwards.

Speakers
Presentations are targeted at students, academics, and experienced engineers working on test automation. Full presentations are 30 minutes and lightning talks are 10 minutes. Speakers should be prepared for a question and answer session following their presentation.

Application
For presentation proposals and/or attendance, complete this form. We will be selecting about 25 talks and 300 attendees for the event. The selection process is not first come first serve (no need to rush your application), and we select a diverse group of engineers from various locations, company sizes, and technical backgrounds.

Deadline
The due date for both presentation and attendance applications is June 1st, 2016.

Cost
There are no registration fees, but speakers and attendees must arrange and pay for their own travel and accommodations.

More information
Please read our FAQ for most common questions
https://developers.google.com/google-test-automation-conference/2016/faq.

GTAC 2016 – Save the Date

by Sonal Shah on behalf of the GTAC Committee


We are pleased to announce that the tenth GTAC (Google Test Automation Conference) will be held on Google’s campus in Sunnyvale (California, USA) on Tuesday and Wednesday, November 15th and 16th, 2016.  


Based on feedback from the last GTAC (2015) and the increasing demand every year, we have decided to keep GTAC on a fall schedule. This schedule is a change from what we previously announced.


The schedule for the next few months is:

May 1, 2016  - Registration opens for speakers and attendees.
June 1, 2016 - Registration closes for speaker and attendee submissions.
June 30, 2016 - Selected attendees will be notified.
August 15, 2016 - Selected speakers will be notified.
November 14, 2016 - Rehearsal day for speakers.
November 15-16, 2016 - GTAC 2016!


As part of our efforts to increase diversity of speakers and attendees at GTAC,  we will be offering travel scholarships for selected applicants from traditionally underrepresented groups in technology.


Stay tuned to this blog and the GTAC website for information about attending or presenting at GTAC. Please do not hesitate to contact [email protected] if you have any questions. We look forward to seeing you there!

From QA to Engineering Productivity

By Ari Shamash

In Google’s early days, a small handful of software engineers built, tested, and released software. But as the user-base grew and products proliferated, engineers started specializing in roles, creating more scale in the development process:

  • Test Engineers (TEs) --  tested new products and systems integration
  • Release Engineers (REs) --  pushed bits into production
  • Site Reliability Engineers (SREs) --  managed systems and data centers 24x7.

This story focuses on the evolution of quality assurance and the roles of the engineers behind it at Google.  The REs and SREs also evolved, but we’ll leave that for another day.

Initially, teams relied heavily on manual operations.  When we attempted to automate testing, we largely focused on the frontends, which worked, because Google was small and our products had fewer integrations.  However, as Google grew, longer and longer manual test cycles bogged down iterations and delayed feature launches.  Also, since we identified bugs later in the development cycle, it took us longer and longer to fix them.  We determined that pushing testing upstream via automation would help address these issues and accelerate velocity.

As manual testing transitioned to automated processes, two separate testing roles began to emerge at Google:

  • Test Engineers (TEs) -- With their deep product knowledge and test/quality domain expertise, TEs focused on what should be tested.
  • Software Engineers in Test (SETs) -- Originally software engineers with deep infrastructure and tooling expertise, SETs built the frameworks and packages required to implement automation.

The impact was significant:

  • Automated tests became more efficient and deterministic (e.g. by improving runtimes, eliminating sources of flakiness, etc.) 
  • Metrics driven engineering proliferated (e.g. improving code and feature coverage led to higher quality products).

Manual operations were reduced to manual verification on new features, and typically only in end-to-end, cross product integration boundaries.  TEs developed extreme depth of knowledge for the products they supported.  They became go-to engineers for product teams that needed expertise in test automation and integration. Their role evolved into a broad spectrum of responsibilities: writing scripts to automate testing, creating tools so developers could test their own code, and constantly designing better and more creative ways to identify weak spots and break software.

SETs (in collaboration with TEs and other engineers) built a wide array of test automation tools and developed best practices that were applicable across many products. Release velocity accelerated for products.  All was good, and there was much rejoicing!

SETs initially focused on building tools for reducing the testing cycle time, since that was the most manually intensive and time consuming phase of getting product code into production.  We made some of these tools available to the software development community: webdriver improvements, protractor, espresso, EarlGrey, martian proxy, karma, and GoogleTest. SETs were interested in sharing and collaborating with others in the industry and established conferences. The industry has also embraced the Test Engineering discipline, as other companies hired software engineers into similar roles, published articles, and drove Test-Driven Development into mainstream practices.

Through these efforts, the testing cycle time decreased dramatically, but interestingly the overall velocity did not increase proportionately, since other phases in the development cycle became the bottleneck.  SETs started building tools to accelerate all other aspects of product development, including:

  • Extending IDEs to make writing and reviewing code easier, shortening the “write code” cycle
  • Automating release verification, shortening the “release code” cycle.
  • Automating real time production system log verification and anomaly detection, helping automate production monitoring.
  • Automating measurement of developer productivity, helping understand what’s working and what isn’t.

In summary, the work done by the SETs naturally progressed from supporting only product testing efforts to include supporting product development efforts as well. Their role now encompassed a much broader Engineering Productivity agenda.

Given the expanded SET charter, we wanted the title of the role to reflect the work. But what should the new title be?  We empowered the SETs to choose a new title, and they overwhelmingly (91%) selected Software Engineer, Tools & Infrastructure (abbreviated to SETI).

Today, SETIs and TEs still collaborate very closely on optimizing the entire development life cycle with a goal of eliminating all friction from getting features into production. Interested in building next generation tools and infrastructure?  Join us!

EarlGrey – iOS Functional UI Testing Framework

By Siddartha Janga on behalf of Google iOS Developers 

Brewing for quite some time, we are excited to announce EarlGrey, a functional UI testing framework for iOS. Several Google apps like YouTube, Google Calendar, Google Photos, Google Translate, Google Play Music and many more have successfully adopted the framework for their functional testing needs.

The key features offered by EarlGrey include:

  • Powerful built-in synchronization : Tests will automatically wait for events such as animations, network requests, etc. before interacting with the UI. This will result in tests that are easier to write (no sleeps or waits) and simple to maintain (straight up procedural description of test steps). 
  • Visibility checking : All interactions occur on elements that users can see. For example, attempting to tap a button that is behind an image will lead to test failure immediately. 
  • Flexible design : The components that determine element selection, interaction, assertion and synchronization have been designed to be extensible. 


Are you in need for a cup of refreshing EarlGrey? EarlGrey has been open sourced under the Apache license. Check out the getting started guide and add EarlGrey to your project using CocoaPods or manually add it to your Xcode project file.

GTAC 2015 Wrap Up

by Michael Klepikov and Lesley Katzen on behalf of the GTAC Committee

The ninth GTAC (Google Test Automation Conference) was held on November 10-11 at the Google Cambridge office, the “Hub” of innovation. The conference was completely packed with presenters and attendees from all over the world, from industry and academia, discussing advances in test automation and the test engineering computer science field, bringing with them a huge diversity of experiences. Speakers from numerous companies and universities (Applitools, Automattic, Bitbar, Georgia Tech, Google, Indian Institute of Science, Intel, LinkedIn, Lockheed Martin, MIT, Nest, Netflix, OptoFidelity, Splunk, Supersonic, Twitter, Uber, University of Waterloo) spoke on a variety of interesting and cutting edge test automation topics.


All presentation videos and slides are posted on the Video Recordings and Presentations pages. All videos have professionally transcribed closed captions, and the YouTube descriptions have the slides links. Enjoy and share!

We had over 1,300 applicants and over 200 of those for speaking. Over 250 people filled our venue to capacity, and the live stream had a peak of about 400 concurrent viewers, with about 3,300 total viewing hours.

Our goal in hosting GTAC is to make the conference highly relevant and useful for both attendees and the larger test engineering community as a whole. Our post-conference survey shows that we are close to achieving that goal; thanks to everyone who completed the feedback survey!

  • Our 82 survey respondents were mostly (81%) test focused professionals with a wide range of 1 to 40 years of experience. 
  • Another 76% of respondents rated the conference as a whole as above average, with marked satisfaction for the venue, the food (those Diwali treats!), and the breadth and coverage of the talks themselves.


The top five most popular talks were:

  • The Uber Challenge of Cross-Application/Cross-Device Testing (Apple Chow and Bian Jiang) 
  • Your Tests Aren't Flaky (Alister Scott) 
  • Statistical Data Sampling (Celal Ziftci and Ben Greenberg) 
  • Coverage is Not Strongly Correlated with Test Suite Effectiveness (Laura Inozemtseva) 
  • Chrome OS Test Automation Lab (Simran Basi and Chris Sosa).


Our social events also proved to be crowd pleasers. The social events were a direct response to feedback from GTAC 2014 for organized opportunities for socialization among the GTAC attendees.


This isn’t to say there isn’t room for improvement. We had 11% of respondents express frustration with event communications and provided some long, thoughtful suggestions for what we could do to improve next year. Also, many of the long form comments asked for a better mix of technologies, noting that mobile had a big presence in the talks this year.

If you have any suggestions on how we can improve, please comment on this post, or better yet – fill out the survey, which remains open. Based on feedback from last year urging more transparency in speaker selection, we included an individual outside of Google in the speaker evaluation. Feedback is precious, we take it very seriously, and we will use it to improve next time around.

Thank you to all the speakers, attendees, and online viewers who made this a special event once again. To receive announcements about the next GTAC, currently planned for early 2017, subscribe to the Google Testing Blog.

GTAC 2015 is Next Week!

by Anthony Vallone on behalf of the GTAC Committee

The ninth GTAC (Google Test Automation Conference) commences on Tuesday, November 10th, at the Google Cambridge office. You can find the latest details on the conference site, including schedule, speaker profiles, and travel tips.

If you have not been invited to attend in person, you can watch the event live. And if you miss the livestream, we will post slides and videos later.

We have an outstanding speaker lineup this year, and we look forward to seeing you all there or online!